ICP Grid Connections

Seamless ICP Grid Connections for every project across the UK

Little Wood End of June-23.jpg
Rowdon Arms RAW-15.jpg
Willows Base-57.jpg
Lincoln Game Keeper DNO-15.jpg
DSC09726.jpg

By working directly with Distribution Network Operators (DNOs), we manage the complex technical and regulatory requirements on your behalf, ensuring your project is delivered safely, compliantly, and on time.

What is an ICP and What Do We Do?

An Independent Connection Provider (ICP) is an accredited company authorised to design, build, and connect new electricity networks to the grid. At Gigawatt, we’re fully certified to deliver ICP services that streamline the entire connection process, from initial design through to final energisation.
 

Why Choose an Accredited ICP?

Willows Base-53 edit 2.jpg

Faster Timelines

Get connected quicker through accredited ICP processes.

Rowden extra.jpg

Cost Efficiency

Lower overall project costs via competitive procurement

Little Wood End of June-21.jpg

Full Compliance

DNO-approved and fully regulated at every step.

Our ICP Services

Willows Base-57.jpg

Feasibility Studies

Design & Approvals 

Construction & Installation 

Testing & Energisation

Survey photos, on-site assessments.

Engineers commissioning live connections

CAD drawings on-screen, team discussions.

Ducting, cabling, and network builds.

Pink Poppy Flowers

Types of Substations 

Step-Down Substations

Transform high-voltage input from the grid into safe, usable power for EV charging hubs and depots. Site surveys, transformer specification, cooling, ventilation & protection systems.

Modular / Compact Substations

Factory-built units that save space and speed up installation.
Reduced civil works, rapid deployment, and future-proof designs.

Indoor / Outdoor / Underground

Flexible enclosures to match your site conditions and planning requirements.
Weatherproofing, drainage, insulation, and service access are considered in every build.

Industrial High-Capacity Substations

Large-scale substations designed for high-demand operations such as fleet depots and multi-bay hubs. 
Robust transformers, advanced protection, cooling systems, and long-term resilience.

Willows September-05.jpg

Our Substation Solutions

At Gigawatt, we don’t just install chargers; we build the electrical backbone that makes them work. Our in-house civil engineers, EV specialists, ICP engineers, and project managers collaborate from the outset to ensure every substation is seamlessly designed, fitted, and built to last.

How Gigawatt Delivers Value

Integrated Design

Full site surveys, load analysis, and capacity planning.

Turnkey Installation 

Groundworks, foundations, cabling, switchgear, and transformer fit-out.

Compliance & Safety

Built to grid operator standards and fully tested, commissioned, and certified.

Future-Proofing

Scalable solutions designed to grow with your site and demand.

Pink Poppy Flowers

Adam Nott

Eo Logo.png

The workmanship was excellent, communication was seamless throughout, and the project was delivered to the highest standard. Gigawatt consistently deliver exceptional value for money without ever compromising on quality or service. Their professionalism and reliability give us confidence, and we would not hesitate to engage them again on future EV installation contracts.

At EO Charging, we’ve had the pleasure of working closely with Gigawatt Industries as our ICP partner on multiple EV infrastructure projects. Their responsiveness from the initial enquiry stage right through to tendering has been outstanding – always quick to react, thorough in their approach, and proactive in offering solutions.

 

A great example of this is the Stagecoach Kilmarnock Bus Station project. Gigawatt were instructed at 12 noon on a Friday to deliver a full 90m off-site HV installation, with the route running directly through an adjacent demolition site. The local council granted only a 9-day window to complete the works, with a start date of 9 am the following Monday. Within just three hours of receiving the scope, Gigawatt returned a full quotation and secured the labour and resources required to mobilise. The works were successfully completed within the strict timeframe, with no disruption to demolition.

 

Eo Logo.png

Adam Nott

Construction Project Manager
EO Charging

Our Testimonials 

Pink Poppy Flowers
Kilmarnock Cable -34.jpg

Construction Project Manager
EO Charging

Pink Poppy Flowers
Pink Poppy Flowers

Featured Projects

Get in touch.

Contact our team for any inquiries or support. We’re committed to providing exceptional service and assisting you with all your Infrastructure needs.
bottom of page